06:18
Starry Sky Dynamics Aerospace has completed multiple key ground tests for the Ceres II launch vehicle.
Jin10 Data reported on August 12 that Galaxy Power Aerospace announced today that it has recently completed multiple key ground tests for the Ceres-2 launch vehicle, including electrical system integration matching tests, control system hardware-in-the-loop simulation tests, full system thermal tests for the attitude control power system, joint tests of the first-stage engine, joint tests of the second-stage engine, static tests of the fairing, separation tests of the fairing, and joint practice tests of the launch vehicle and rocket. The first flight of the Ceres-2 launch vehicle is entering the countdown phase, and it will carry 6 commercial satellites and 2 non-separable payloads, with a total payload exceeding 1 ton.