The world's largest hybrid pumped-storage power station under construction achieves dual breakthroughs

Today (the 22nd), the world’s largest hybrid pumped-storage power station under construction—Sichuan Yalongjiang Lianghekou Pumped Storage Power Station—reached a critical milestone with dual breakthroughs: the excavation of the underground powerhouse is complete, and concrete pouring has begun at the downstream reservoir.

At an altitude of 3,000 meters on the western Sichuan Plateau, over a thousand builders worked tirelessly during the Spring Festival, seizing the “golden window” of the dry season to accelerate construction. Core projects such as underground caverns and water diversion tunnels are progressing steadily.

This high-altitude green energy “supercharger” is rapidly taking shape, providing vital support for China’s clean energy supply and grid regulation.

(CCTV News)

View Original
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • Comment
  • Repost
  • Share
Comment
0/400
No comments
  • Pin

Trade Crypto Anywhere Anytime
qrCode
Scan to download Gate App
Community
  • 简体中文
  • English
  • Tiếng Việt
  • 繁體中文
  • Español
  • Русский
  • Français (Afrique)
  • Português (Portugal)
  • Bahasa Indonesia
  • 日本語
  • بالعربية
  • Українська
  • Português (Brasil)