Futures
Access hundreds of perpetual contracts
TradFi
Gold
One platform for global traditional assets
Options
Hot
Trade European-style vanilla options
Unified Account
Maximize your capital efficiency
Demo Trading
Introduction to Futures Trading
Learn the basics of futures trading
Futures Events
Join events to earn rewards
Demo Trading
Use virtual funds to practice risk-free trading
Launch
CandyDrop
Collect candies to earn airdrops
Launchpool
Quick staking, earn potential new tokens
HODLer Airdrop
Hold GT and get massive airdrops for free
Launchpad
Be early to the next big token project
Alpha Points
Trade on-chain assets and earn airdrops
Futures Points
Earn futures points and claim airdrop rewards
Inner Mongolia Baitte Metallurgical Building Materials Co., Ltd. issues a statement: Reduce production of one 42,000 KVA silicon-manganese alloy submerged arc furnace.
On March 31, Inner Mongolia Baiter Metallurgy Building Materials Co., Ltd. issued a statement: Recently, imported manganese ore has seen a sharp price increase. The factory’s manganese-based ferrosilicon alloy production costs have risen significantly, leading to comprehensive losses on the products. To reduce operating risk, Inner Mongolia Baiter Metallurgy Building Materials Co., Ltd. has, starting from the night of March 31, reduced production of one 42,000 KVA silicon manganese alloy blast furnace (electric furnace). The actual impact is a reduction of 300 tons per day in silicon manganese output. (Mysteel)